Search ENP
Powered by Blogger.
ENP Home
Posts By Category
Posts By Location
Posts By Date
-
►
2015
(3740)
- December (259)
- November (308)
- October (338)
- September (345)
- August (221)
- July (277)
- June (360)
- May (299)
- April (263)
- March (379)
- February (289)
- January (402)
Upcoming Events
Tuesday, December 2, 2014
11:46 PM
| | Edit Post
State Department of Transportation employees work to install a pedestrian bridge over Donner Creek this afternoon. (HEATHER N. GRIMMER / ENP PHOTOGRAPHER) |
ENP STAFF REPORTS
news@eastniagarapost.com
A crane lowers the pedestrian bridge into place this morning.
(PHOTO CONTRIBUTED BY RON KOMARA/DOT)
|
The new 50-foot-bridge crosses Donner Creek on the south side of the road across from Snyder Drive.
The bridge, in conjunction with a new sidewalk, will allow pedestrians to safely traverse Robinson Road without having to walk in the roadway. There have been a number of accidents involving pedestrians getting hit along Robinson Road between Transit Road and Beattie Ave.
The 50-foot bridge will allow pedestrians to walk along Dysinger Road without having to walk on the roadway itself. (HEATHER N. GRIMMER / ENP PHOTOGRAPHER) |
For more photos of the bridge, click here.
Send an email to news@eastniagarapost.com with "email update" in the subject line.
Labels:News,NYSDOT,Robinson Road,Town of Lockport
Subscribe to:
Post Comments
(Atom)
0 comments:
Post a Comment
Comments are always appreciated. Your comment will be reviewed for approval before being made public.